Method / Developing a read

Developing a read

The order of the parts, from the tray to the fixed print.

Weephole reads the project inside a sealed sandbox, as files and responses. Each part develops in turn and every trace is confirmed before it reaches the print.

Stages

  1. Load the tray. Repository, site and contracts are gathered as one project.
  2. Expose. The read covers each commit, each page with its bundles, and each contract.
  3. Test the traces. Anything shaped like a key must pass its own math: a checksum, a key pair or a derived address.
  4. Rinse. Sample values and test keys wash away, so what is left is real.
  5. Grade. Every mark is graded by kind and by severity; a key able to move funds or hold a contract role is critical.
  6. Fix and hang. The public card hangs, the verified owner opens the enlargement, and verified prints are written to Robinhood Chain.